Home » Products » Hardware » Building Mechanical & Electrical Equipment » Building Mechanical & Electrical Supply
Energy saving damper ----protective fitting for overhead transmission line FDB0712
Delivery term:The date of payment from buyers deliver within days- Price:
Negotiable
- minimum:
- Total supply:
- Delivery term:
The date of payment from buyers deliver within days
- seat:
Beijing
- Validity to:
Long-term effective
- Last update:
2017-12-29 15:23
- Browse the number:
172
Company Profile
- Zhejiang Holley International Co. Ltd By certification [File Integrity]
-
Contact:
xplightning(Ms.)
- Telephone:
-
Area:
Beijing
-
Address:
Holley Technology Park, Wuchang, Hangzhou, Zhejiang, China (310023)
- Website: http://xplightning.stonewallspecialists.com/
Product details
Model Number: FDB0712
Brand Name: XPFL
Key Specifications/Special Features:
Energy saving damper ----protective fitting for overhead transmission line FDB0712Clamp is aluminium alloy and counter weight is zinc alloy, norm parts are stainless steel.Protective fittings are used to restrain aeolian vibration of conductor and ground wire for overhead transmission lines or to grade and to shield the insulator string of 330kV and above transmission lines and substation. For example, dampers, spacers, grading and shielding rings.M-busbarR-cableF-protection, end capY-preformed armor rodD-conductor
J-space, voltage
Z-damper terminal
Q-ball joint
G-steel wire
The conductor can be enwound by aluminium tapes as installing dampers and spacers onto it.
Specifications:
J-space, voltage
Z-damper terminal
Q-ball joint
G-steel wire
The conductor can be enwound by aluminium tapes as installing dampers and spacers onto it.
Specifications:
Model No. | Dia. of applicable wire | Main dimensions (mm) | Weight (kg) | |
L | H | |||
FDB0712 | 7-12 | 420 | 35 | 1.30 |
FDB1215 | 12-15 | 420 | 40 | 1.30 |
FDB1518 | 15-18 | 420 | 40 | 1.30 |
FDB1821 | 18-21 | 420 | 15 | 1.30 |
FDB2124 | 21-24 | 456 | 15 | 2.50 |
FDB2427 | 24-27 | 480 | 50 | 4.60 |
FDB2730 | 27-30 | 480 | 50 | 4.80 |
Shipping Information:
- FOB Port: China (Mainland)
- Lead Time: 20 - 30 days
Main Export Markets:
- Asia
- Central/South America
- Eastern Europe
- Mid East/Africa
- Western Europe
New Products
-
High Speed Plain Stocking Knitting Machine
price: Negotiable
-
Printed Holland Velvet Fabric
price: Negotiable
-
Grey Melamine Dinner Set
price: Negotiable
-
Clear PVC Vinyl Dining Table Mat
price: Negotiable
-
Wall LED Shelf for Sunglasses Display Design
price: Negotiable
-
Aluminium Alloy Electric Bicycle
price: Negotiable